Electrical · Quotation

    Electrician's quote in Sopron: how the site survey and a comparable quote work

    On the phone we can't give you a binding price — that isn't a sales tactic, it's the nature of the trade. In this article we show what happens during the on-site survey, what to prepare, and what a good quote must contain.

    Simple Smart Elektro · October 2026 · 8 min read

    If you're looking for an electrician in Sopron, you'll sooner or later come to the question: “how much does it cost?”. It's completely natural that you want to see prices before you call anyone. Our experience shows, however, that on the phone or by email we can't give you a binding quote — and that's not a sales tactic, it's the nature of the trade. In this article we show what happens during the on-site survey, what you should prepare, and what a good quote must contain so that you don't just get a number, but a comparable, later defensible document.

    At the end of the article you'll find our service area, a short FAQ block, and how to apply for the free on-site survey.

    Survey sketch and tools — how an electrician's quote in Sopron comes together
    Free on-site survey in Sopron + 30 km

    1. Why can't a binding quote be given “over the phone”?

    Many people ask: “a socket in the living room, a new circuit for the air conditioner or the microwave — how much?” On the phone, we don't learn enough to give a responsible price. Not because the tradesperson is being secretive, but because for electrical work the price depends on at least this many things:

    • The state of the existing wiring. Old aluminium cable, an aged distribution board, missing protective earth, outdated fuses — all of these change what needs to be done before the “socket”.
    • The wall type and the cable route. Brick, concrete, adobe, plasterboard — each calls for a different technique (and different tools, different plaster repair). In a terraced house, a chasing-free, wireless solution can also be considered, which has a completely different cost structure.
    • The capacity of the distribution board. Is there room for a new circuit? Does the supply need to be upgraded? Today's household (induction hob, air conditioning, EV charger, heat pump) often no longer fits into a single-phase, low-capacity meter point.
    • Legal and standards-based obligations. Residential electrical networks come with mandatory protective devices (e.g. RCD), documentation duties and test reports. Part of this protects you too — it can't be “trimmed out” of the price.
    • Your idea of the end result. Is the new socket in the living room a plain socket, a flush-mounted one with a colour-matched frame, perhaps USB-C, or a smart one integrated with Loxone? These give very different material and labour costs.

    The on-site survey is therefore not a “discussion”, but a prerequisite for the work: there we can look at the wall, the cabinet and the cable-route options, and discuss what you actually want. The survey in Sopron and within a 30 km radius is free and without obligation (the conditions for further-out locations are in section 5) — this isn't “sales prospecting”, it's the condition for a responsible quote.

    Four factors we check on the on-site survey for the quote
    Network state, wall/cable route, distribution-board capacity, protective devices

    2. What should you prepare for the survey?

    It helps if you don't arrive at the survey empty-handed. The more we know in advance, the more accurate and detailed the quote will be. Go through the list below in the days before the survey — nothing is mandatory; if anything's missing, we'll find a workaround.

    Floor plan and room use

    A simple sketch (either hand-drawn or copied from the plan) helps a lot. It doesn't have to be a scale-accurate, official plan — “here's the living room, here's the kitchen, here's the bedroom” is enough. On top of it we can mark the planned sockets, lights, switches and smart-home devices.

    Requirements list: what you want — and what you don't

    Think it through:

    • How many new sockets, how many new lights?
    • Will you need air conditioning, an electric hob, an EV charger, a heat pump? Each requires a different circuit layout and protection.
    • Do you want smart control (e.g. Loxone, Fibaro)? The cabling can be added later, but it's much easier now, while the wall is open.
    • Where is the current problem? (e.g. “the LED flickers”, “the RCD trips”, “the socket in the corner isn't enough”) — gather these too.

    Photos of the distribution board and the current state

    • One or two photos of the distribution board (with the door open, showing the fuses) help a lot with remote preparation.
    • If there's a problem at a specific spot: a photo of the wall section or the socket where something isn't right.

    Earlier plans, electrical plans, test reports

    If the building has an electrical plan (e.g. drawn up for a new build), or if you have documentation of earlier renovations, bring them along. For a meter-point upgrade, the network operator's (e.g. E.ON) information sheets are also useful. It's not a problem if you don't have any — it's not a deal-breaker.

    Access and other notes

    • Access to the property: will you be at home during the work, or does it need to be done while you're away?
    • If it's in a block of flats: are there house-rules (e.g. quiet hours, shared spaces)?
    • Pets, allergies, special requirements (e.g. you'd like the flat to remain liveable during the work)?

    We use this information for the quote too — the more concrete the requirements list, the more concrete the quote.

    Five things worth preparing for the electrician's on-site survey
    Bring to the survey: floor plan, requirements list, photos, plan, access notes

    3. What should a good quote contain?

    A quote is not a number on a single line. A responsible contractor gives you a document that shows: what they'll do, from what, with which material, by when, and why it costs exactly that. The list below is the minimum you should find in a comparable quote:

    Itemised material list

    • Socket, switch, cable, conduit, junction box — type, brand, quantity, unit price.
    • Distribution-board elements: which fuse, which circuit, which RCD.
    • Smart-home devices: exact model (Loxone, Fibaro), controller, power supply, sensors.
    • A separate line for expected material waste and the cost of debris removal (where relevant).

    Itemised labour

    • Which work step takes how long (e.g. 6 lm of chasing and plaster repair, 40 m of cabling, 1 distribution-board assembly).
    • For labour, an hourly rate is normally not given — a responsible contractor prices per work step, and the quote should show that.

    Schedule

    • Planned start date.
    • Planned finishing date (calendar day or working day).
    • What happens if a change comes up along the way (e.g. a hidden fault in the wall) — the impact on the timeline.

    Warranty and guarantee

    • What warranty applies to the work and the material.
    • What to do in a warranty case (reporting, call-out, repair).

    What's not included — and why that matters

    • The “not” list is more important than you might think. Here you'll find: what costs extra (e.g. plaster repair alongside the electrical work), what is your responsibility (e.g. moving furniture), and what legally isn't our job (e.g. dealing with the network operator, or the meter replacement).
    • The “what's not included” section of the quote also protects you: if a new requirement comes up later, there's no argument about “that was agreed verbally”. Anything that isn't in the quote is a matter for a separate agreement.

    Documentation handover

    • For distribution-board assembly, a new meter point: completion record, circuit diagram, material list.
    • For a smart-home system: saving the configuration file, handing over usernames and passwords (in an agreed, secure form), user guide.

    Payment schedule

    • Deposit, interim invoice, final invoice — when, what amount.
    • Bank transfer or cash, VAT receipt.

    If a quote doesn't contain these and is “just one number on a line”, then it is not comparable with other quotes — even if at first glance it looks cheaper. In the next section we'll look at why.

    Six elements of a comparable quote — material list, labour, schedule, warranty, exclusions, documentation
    The six elements of a good quote

    4. How to compare several quotes

    If you ask several contractors for quotes, don't just compare the bottom line. The steps below will help you really compare “apples with apples”.

    1. Ask each contractor for a quote based on the same requirements list.
    Don't send one contractor “just the socket” and another “the socket and the light”. Ask for the same work, with the same materials, with the same deadline — only then can the quotes be compared.

    2. Check what's in and what's out.

    • In both quotes: how many metres of cable, how many sockets, how many fuses, which RCD, which material quality.
    • Where one quote has “extra” lines (e.g. “plaster repair”), the other should have them too — if not, the other has either left them out or “folded them in” elsewhere.

    3. Compare the split between material and labour, not just the total.

    • If one has cheaper material but more expensive labour than the other, it's worth asking: which material do they specify (brand, type), and how much time do they allow for the work.
    • Cheap material is often not the same as premium material — a cheaper socket or fuse can mean compromises in lifetime, fire safety or handling. (Not a sin: there are places where the cheaper material is perfectly fine. The point is that you know what you're buying.)

    4. Schedule and warranty are also “value”.
    A faster deadline is valuable to you if you're up against it. A longer warranty gives you peace of mind. Take those into account too, not just the number.

    5. Communication is also a signal.
    Which contractor replied quickly, politely, asked questions, suggested alternatives? Which one “just dropped a number” in a message? How the survey and the quote process go is a sign of how the later collaboration will go.

    In short: don't compare the bottom line of the quote, compare the quote itself. Two quotes that look similar at first glance can cover very different work — in one, final cleaning and debris removal are included, in the other they're not.

    Two quotes side by side — it's the breakdown, not the bottom line, that matters
    It's the breakdown, not the bottom line, that decides.

    5. Service area and what stands behind our work

    We work in Sopron and the surrounding villages. In Sopron and within a 30 km radius — for example Fertőd, Fertőszentmiklós, Harka, Ágfalva, Kópháza and Nagycenk — the on-site survey is free and without obligation. We do travel further too (e.g. to Kapuvár); there we charge a call-out fee for the on-site survey, which is deducted from the quote if you accept it.

    What stands behind us:

    • An official, registered electrician background.
    • Warranty on the work carried out — the exact warranty terms are recorded in writing in the quote.
    • Free on-site survey in Sopron and within 30 km — without obligation.
    • Modern solutions: alongside traditional electrical work we also install Loxone and Fibaro smart-home systems, as well as IP camera systems. If the survey shows that smart-home components would be worth adding alongside the electrical work, we'll discuss it.

    If, after the survey, the quote isn't what you're looking for, we're happy to give you a second opinion — there's no obligation on your side.

    6. FAQ — common questions about the survey and the quote

    How much does an electrician's on-site survey cost in Sopron?

    In Sopron and within 30 km (e.g. Fertőd, Fertőszentmiklós, Harka, Ágfalva, Kópháza, Nagycenk) the survey is free: we charge no fee, and you're not obliged to give us the work. We do travel further too (e.g. to Kapuvár); there we charge a call-out fee for the on-site survey, which is deducted from the quote if you accept it. The point of the survey is that you get a precise, itemised quote.

    How long does it take to receive the quote after the survey?

    We send the quote after the survey, in writing and itemised; the exact timing is agreed on site.

    I'm asking several contractors for quotes — is that a problem for you?

    No. On the contrary, we recommend that you get several quotes and compare them along the lines above. There's no awkwardness and no pressure from us.

    What does the split between “labour” and “material cost” in the quote mean?

    The material cost is the purchase price of the materials used (cable, socket, fuse, etc.). The labour is the wage for installation, chasing, wiring, documentation and testing. Together they make up the project price. The exact split is itemised in the quote.

    7. Closing CTA — Request a free on-site survey

    If you're planning electrical work in Sopron or the surrounding area — whether it's a one- or two-day socket extension, a full wiring renovation, a distribution-board assembly, or a smart-home integration — request a free on-site survey from us.

    Request a free on-site survey

    In Sopron and within a 30 km radius the survey is free and without obligation. You'll receive the quote after the survey, in writing and itemised — and we're happy to give you a second opinion too.

    📞 +36 30 522 7954 ✉️ info@simplesmartelektro.hu Electrical installation in Sopron → 5 signs you need to call an electrician →